Increase accessibility to green open spaces

Greater Easterhouse Green and Blue Network

Green Infrastructure Strategic Intervention: Greater Easterhouse

The project will involve the creation of two green-blue infrastructure corridors which will connect to the large Seven Lochs Wetland Park. The green networks will provide communities in the Greater Easterhosue area with a green connection to the larger wetland park but will also provide them with a local greenspace. 

Key aims:

  • Create and improve multi-functional and connected greenspaces 
  • Creation of habitats
  • Reduce flood risk
  • Improve health and well-being of local communities

Halfway Community Park

Green Infrastructure Strategic Intervention: Halfway Community Park

The area is poorly connected to green space and in 2013 Glasgow City Council’s open space audit concluded that the site was of poor quality and limited functionality. The towers consist of mainly family flats and over 20% of the population are from an ethnic minority background. The project proposal was developed with community needs considered and 88% of locals indicated they very much wanted to see changes made to the space. There was an obvious need for a functional space which enhanced the quality of life for a community living in one of the most disadvantaged neighbourhoods in...

Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...

Middlefield Greenspace

The issues identified at the site were lack of connectivity, safety, vandalism, poor signage and quality of the space due to frequent flooding. Aberdeen City Council has worked with the community extensively, which included conducting a ‘Total Place’ audit of the neighbourhood in 2014, consulting with children at after school clubs and with the local community groups. The result was a funding application which represented the needs of the community: improving the functionality and aesthetics of the park and introducing a flood alleviation scheme. 

Key aims:

  • Reduce the
  • ...

Fernbrae Meadows Urban Park

Green Infrastructure Strategic Intervention: Fernbrae Meadows

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the Green Infrastructure Strategic Intervention (GISI), which was granted in 2017. A ‘friends of’...

Urban Regeneration in the District of Ferencvaros (Budapest)

Közösségi Park - Google Maps
  • Complex development of a run-down part of the district (Refurbishment/ urban renewal)

The target area is located in the heart of Budapest. This pioneer project was realized before urban planners would have recognized the importance of urban green spaces. At the same time this project brought measurable market benefits (appreciation of occupied property), also helped to create a neighbourhood community. The project was a succesful tool in mitigating the negative effects of urban heat island, and summer air temperatures significantly decreased.

...

Promenade along river Danube

  • Develop a concept and implement numerous pilot projects on the riverbank

The main purpose of the project is to design a promande among the Danube quays in Budapest, planting plants, building installations, and awareness rising. The goal is the sharing of the sensation of the Danube in the city, recommending the daily utilization of the river side to citizens.

The project is a good example for the implementation of strategic NBSs, with putting great emphasis on the corporate development and implementation, by creating networks. 

The...