Reducing temperature at meso or micro scale

Promenade along river Danube

  • Develop a concept and implement numerous pilot projects on the riverbank

The main purpose of the project is to design a promande among the Danube quays in Budapest, planting plants, building installations, and awareness rising. The goal is the sharing of the sensation of the Danube in the city, recommending the daily utilization of the river side to citizens.

The project is a good example for the implementation of strategic NBSs, with putting great emphasis on the corporate development and implementation, by creating networks. 

The...

Saida School - Ecological and Participatory Approach in a School Refurbishment

Eco-School Saida Entrance
  • Develop a school refurbishment in an ecological and participatory approach
  • Contribute to the sustainable development of the well-being of children and educational community

Implementation of an ecological building (low-energy building) favorable for biodiversity, partial impervious pavement release, green spaces and vegetable gardens creation. This project is also notable for children and educational community consultation in its conception, making them as full stakeholders. The design reinforces the ecological networks at the...

Urban Natural Park, Based on Natural, Historical and Cultural Heritage Promotion and Eco-Citizenship

Strasbourg municipality
  • Creation of an urban natural park as a metropolitan governance tool
  • Encourage sustainable territorial development based on natural, historical and cultural heritage promotion, and eco-citizenship
  • Deliver sustainable solutions at a large scale to maximize benefits for society and the environment

The action encourages sustainable territorial development based on natural, historical and cultural heritage promotion and eco-citizenship. The governance is based on a charter included in the Local Urbanism Plan...

Quay Garden Project - Habitats for Local Species on a City Center River

Quay Gardens - Habitats for local species
  • Implementation of vegetated rafts as habitats for local species on a city center river
  • Using Bio-sourced materials

It aims to implement artificial shelters for fauna (nesting box, insect hotels, artificial spawning areas…) and vegetation supports were installed. Wooden terraces were also installed to allow citizens to enjoy and observe biodiversity. This project is both thought for biodiversity and for citizens and finaly allow cohabitation between them.

Green Façade Pilot Project, INPS, Genova

 INPS (National Institute  Social Insurance) Green Facade - Genoa neighborhood of Sestri Ponente

A vertical greening system installed on the facade of an office building built early in the last century and renovated in the 1980’s, owned by INPS (National Institute of Social Insurance) and located in the city center of the Genova neighborhood of Sestri Ponente.

INPS Green Facade is a pilot project coordinated by the University of Genoa (DAD) which aims to quantify the positive effects of the green envelopes in densely built urban environment. Monitoring activities are focused on the evaluation of the environmental benefits, both economic and social, in particular in densely...

Environmental recovery of a quarry ATEg20 - Pozzuolo Martesana, Truccazzano

Quarry restoration ATEg20

This project consists in two main areas :
- the northern portion : object of the first phases of extraction ended in 2007
- the southern portion : subject of the cultivation plan and recovery of recent years
The proposed project involves the areas cultivated in the northern part. It forecast an environmental naturalistic recovery and the conclusion of the overall environmental recovery of the entire extractive area.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use;
•...

Environmental recovery of a quarry ATEg32 - Gaggiano, Trezzano sul Naviglio, Zibido San Giacomo

Quarry restoration ATEg32

This project aims to include : 
• transformation of some portions of agricultural land in wooded strips and recovery of some rows, that were not in a good state of preservation;
• creation of a new area for the relocation of the working installations;
• fulfillment of the existing ecological network and hiding/masking of the extractive areas;
• realization of set-aside fauna;
• realization of a cane thicket with the use of lime arising from the washing of extracted gravel and sands;
• realization of areas for activities with canoe
• creation of an...

Environmental recovery of a quarry ATEg15 Paderno Dugnano

Quarry restoration ATEg15 Paderno Dugnano

The area is characterized by by the presence of two separate lakes connected by a tree-lined pathway. The first lake is used for the fishing while the second one is characterized by a more spontaneous development of wild flora and is the home of different bird species.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• putting containment elements of the soil in particularly steep points;
• realization of green ramparts and rows of trees to masking/hiding noise and dust deriving...

Environmental recovery of a quarry ATEg30 Pero

ATEg30 - quarry restoration

The project aims to transform an old quarry in a public park. The project foresees the renaturalization of the lakeshore, the realization of a peninsula, the filling of settling tanks created for the extraction activities and the realization weak slope in the nord sector that want connect the lake with the countryside.
Objectives are to create : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• laying turf
• vegetation reconstruction of marsh and riparian environment
• vegetation...