Improve connectivity and functionality of green and blue infrastructures

Kampinos National Park

Kampinos National Park (c M.Szajowski & A.Andrzejewska)

The wetlands in Kampinos National Park, Poland, are restored in order to slow water runoff and protect Natura2000 habitats as well as species.

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration of freshwater-related ecosystems in a Landscape context: INnovation, upscaling and transformation.

Room for the Rhine branches

flooded Rhine branches in the Netherlands

The aim of this case study is the creation of ecological flood retention by changing land use, reconnecting floodplains and change of sluice management in summer dikes. Floodplains are reconnected and side channels restored or their creation supported, with longitudinal main channel dams benefitting both shipping and nature.

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration of freshwater-related ecosystems in a Landscape context: INnovation, upscaling and transformation.

Kristianstads Vattenrike - Sweden’s oldest UNESCO biosphere reserve

In 2005, the UN agency UNESCO approved Kristianstads Vattenriket as a biosphere reserve covering 100 000 ha, and one of 700 in the world. This means Kristianstads Vattenrike is an internationally recognized  model for sustainable development. The Vattenrike encompasses two thirds of the municipality of Kristianstad, with the goal to “preserve, develop and support the landscape's values”. 

Nature-based solutions have been key for protection against droughts, floods, and preservation of the area, as well as nutrient leakage into the Baltic Sea.

The areas in Vattenriket include...

Removing dams in the Deba River, Spain

Dam removal in the Deba River

The hydro-geomorphology of the Deba River basin in the Basque country will be restored, mainly through dam demolition, restoring river morphology, connectivity and faunal permeability. Stakeholder interaction is being promoted, connecting local communities, institutions and governments. A main objective is to promote environmental education and the conceptualisation of nature-based solutions oriented restoration policies.

This case study is one of 17 that are part of the EU Horizon2020 project MERLIN - Mainstreaming Ecological Restoration of freshwater-related ecosystems in a...

Articulación de los espacios verdes públicos del parque Metropolitano Albarregas.

Porción del Parque Metropolitano

Rehabilitar e integrar las áreas del bosque urbano del parque metropolitano Albarregas para la creación de espacios públicos verdes adecuados para la recreación, que sean funcionales y estén interconectados con la ciudad para dar cumplimiento a los Objetivos de Desarrollo Sostenible (ODS), y de esta forma dar valor al capital natural de la ciudad mejorando la sostenibilidad y resiliencia al cambio climático.

Erosion Protection with Nature-based Solutions in Norway

The Norwegian Institute for Bioeconomy will prevent erosion by strengthening slopes and edges with nature-based solutions (NbS). The aim is to improve local environmental conditions and increase water quality and biodiversity in streams and rivers.

In many creeks and streams, both large and small, erosion is a major problem. The problem arises as a result of various types of interventions in nature and is typically solved with stone and concrete - so-called grey solutions. But the grey solutions often have negative consequences on the local environmental conditions, water quality...

Nature-based solutions for cities transitioning towards sustainability: A participatory evaluation through a social and environmental lens

Global urbanization trends have made people move to cities where they tend to have less access to nature. Urban nature is important for human well-being and biodiversity, therefore urban planners are increasingly integrating Nature-based Solutions (NbS) projects in urban environments. 

This research investigated how to support citizen engagement for NbS while evaluating the urban environment, focusing on young people as they are often excluded from decision-making and planning processes. 

The research design included a literature review and interviews with city planners, to...

Territorial Ordering Plan (POT) of Bogotá 2022-2035 "El reverdecer de Bogotá"

On September 2021, the mayor and the District Planning Secretary presented the proposal for the Territorial Ordering Plan (POT ) 2022-2035. This POT responds and involves the Sustainable Development Goals in land use planning. Based on these areas, the plan incorporates on four pillars, including sustainable mobility, greening, a care system for women and sustainable economic economy.