Developing climate change adaptation; improving risk management and resilience

Habitat enhancement of stone clad sea walls.

Seawalls are usually seen only as flood alleviation structures rather than as having other possible functions to benefit the wide environment. Where new walls are being installed there is opportunity to include more sympathetic “nature friendly” textured finishes to improve or maintain biodiversity. Where seawalls are already installed, retrofit enhancement measures provide significant opportunities. Small alterations were made to the mortar pointing between decorative stone cladding of a section of vertical concrete wall during construction of the Shaldon and Ringmore Tidal Defence Scheme...

NAIAD Case Studies: Brague Demonstration site (France)

Nature Based Solutions management is more than a technical problem: specific design and integrated decision-making frameworks are needed. From a more global point of view, choice of Nature Based Solutions and effectiveness assessment require specific principles mixing pluridisciplinary quantitative and qualitative criteria and indicators. It is important to note that the choice and definition of NbS’ effectiveness indicators highly depend on time, spatial scales and decision-making contexts. La Brague DEMO proposes some pathways to contribute to this objective. It is indeed essential to...

NAIAD Case Studies: Lower Danube Demonstration site (Romania)

The Lower Danube demo case has as main objective to create an efficient network of national, regional and local stakeholders in order to apply collaborative approach for water security measures and extreme meteorological events mitigation by using the ecosystem service and green infrastructure. In the NAIAD project the Lower Danube demo case study is focused on understanding the social risk perception and challenges for NbS implementation, to open business opportunities for insurance sector and to identify potential business model to foster Nature Based Solutions implementation and...

NAIAD Case Studies: Glinščica Demonstration Site (Ljubljana, Slovenia)

Glinščica catchment

The aim of Slovenian demo is to prepare a comparison of Nature based solutions and grey scenarios for the Glinščica catchment area, valuate the ecosystem services provided by implementation of restoration and management measures developed within the project and to develop and deploy economic and/or financial instruments (in the form of nature assurance schemes) for effective business models in the field of ecosystem services, green infrastructure and river restoration that would highlight the importance of understanding the value of ecosystems in the long run.

UoG Green Screens

Green Screen Experiment

To investigate the extent to which green screens (helix hedera) may provide regulatory ecosystem services. This includes acting as a buffer against airborne particulate pollution and reducing rainfall runoff rates compared to normal plywood construction hoarding. 

Greater Easterhouse Green and Blue Network

Green Infrastructure Strategic Intervention: Greater Easterhouse

The project will involve the creation of two green-blue infrastructure corridors which will connect to the large Seven Lochs Wetland Park. The green networks will provide communities in the Greater Easterhosue area with a green connection to the larger wetland park but will also provide them with a local greenspace. 

Key aims:

  • Create and improve multi-functional and connected greenspaces 
  • Creation of habitats
  • Reduce flood risk
  • Improve health and well-being of local communities

Integrated green grey infrastructure (IGGI) - Green screen guard rail.

Air quality in urban areas is a known issue for health and quality of life. Motorised vehicles produce a range of pollutants that can affect human health. These include very small particles emitted from exhaust (especially from diesel-fuelled vehicles), and from wear-and-tear on brakes and tyres. If inhaled these particles can cause a range of both short-term and more chronic health problems, including increased chances of death from respiratory and cardiovascular disease. This Particulate Matter (PM) is measured in microns (one micron is one millionth of a metre). Health concerns start...

Halfway Community Park

Green Infrastructure Strategic Intervention: Halfway Community Park

The area is poorly connected to green space and in 2013 Glasgow City Council’s open space audit concluded that the site was of poor quality and limited functionality. The towers consist of mainly family flats and over 20% of the population are from an ethnic minority background. The project proposal was developed with community needs considered and 88% of locals indicated they very much wanted to see changes made to the space. There was an obvious need for a functional space which enhanced the quality of life for a community living in one of the most disadvantaged neighbourhoods in...

Canal and North Gateway

Green Infrastructure Strategic Intervention: Canal and North Gateway

Extensive community engagement sessions were conducted from 2015-2016 by Scottish Canals and Glasgow City Council, including a charrette at Port Dundas which recognised the role green and blue infrastructure could play in regenerating the area. As a result of this, plans to develop the area included extending the path network, re-designing entrances, installing boardwalks, creating picnic areas and building a bridge across the canal to improve access.

The second part of the project is the ‘Smart Canal’ and this forms part of the North Glasgow Integrated Water Management System and...